PCE Nigeria Logo
ZHANJIANG, CHINA

4,060 metres through gravel and sand.

2019

A long-distance intersecting HDD crossing executed using 600-ton and 500-ton rigs.

Crossing Length4,060 m
Maximum Rig Pullback600 t
Execution Period2018 – 2019