PCE Nigeria Logo
RAOYANG RIVER, CHINA

2,293 metres across the river.

NOVEMBER 2022

A large-diameter gas-pipeline crossing through sand and gravel strata.

Crossing Length2,293 m
Pipeline Diameter48 in
Depth30 m
Execution PeriodJune – November 2022