PCE Nigeria Logo
THAILAND · BANG PAKONG

Two major gas crossings.

MAY 2025

Two steel gas-pipeline crossings through clay and sand.

Crossing One1,150 m
Crossing Two1,100 m
Pipeline Diameter36 in
Maximum Pullback600 t
Execution PeriodAugust 2024 – May 2025