GUANGDONG, CHINA
Five parallel offshore crossings.
APRIL 2024
Five parallel HDD crossings for steel gas pipelines through clay, sand and rock.
Parallel Crossings5 × 2,100 m
Pipeline Size20 in
Execution PeriodOctober 2023 – April 2024
Five parallel HDD crossings for steel gas pipelines through clay, sand and rock.